Leading Civil Construction Company in Karachi | SMS Constructions

Completion DateMarch 2025
ClientsKarachi Water and Sewerage Services Improvement Project (KWSSIP)
LocationMalir River, Karachi, Pakistan
CategoryMalir River, Karachi, Pakistan
BudgetPKR 2,237.10 Million

Project Summary

The Malir GK Conduit Project focuses on the rehabilitation and protection of the Greater Karachi (G.K.) bulk water transmission system at the Malir River crossing. The project includes strengthening existing protection works, constructing gabion box protection, riverbank stabilization, stone pitching, erosion control measures, and temporary river diversion works to safeguard critical water infrastructure and ensure a reliable water supply to Karachi.

Key Highlights

  • Rehabilitation and protection of critical G.K. bulk water transmission infrastructure
  • Gabion box protection and riverbank stabilization to prevent erosion and flood damage
  • Temporary cofferdams and river diversion works to enable safe construction
  • Enhanced long-term resilience and reliability of Karachi’s bulk water supply system